Wednesday 4 March 2015

Production: Blog Post 43 - Production Diary (Reflection) Re-do of filming 25/02/15

On Monday the 23rd was inset day which meant we had no access to college, which meant that we could not film our bathroom scene/final scene or do any editing. This really affected us as our deadline for our coursework was really close.

However on Wednesday the 25th of February we arranged a day where we were all free to take this scene again. As this was not in our actual production schedule and it happened spontaneously. We re-shot the bathroom scene for our movie the Mirrordream. After college was finished we got our equipment and started filming. During this session all of us contributed to the filming and getting it done the right way. As our mistake last time was that we filmed this scene in 720p instead of 1080p. Our filming session went really well as we got all the shots we needed done.

This scene did take a lot of time to film as we were filming in many different angles, which meant that we didn't have enough time to film the final scene as, the equipment we borrowed had to be back by 4:30.  We plan to film on Thursday 26th to do our final scene and include that in our editing to produce a final successful piece.

- Seren Esmanoglu

No comments:

Post a Comment