Blog Task 43 - Production Reflection, filming 25/02/15

Due to inset day on Monday 23rd February, we missed a potential three hours to work on our title sequence and complete all of the things we had left to do, such as finish the second rough cut and film the bathroom or college scenes. This was a huge problem for us so we decided to meet up outside of lesson time, after college on Wednesday 25th. This obviously wasn't planned nor was it in our production schedule however it needed to be done and Wednesday was the day that we were all free, as every other day was impossible due to lessons clashing and the time-frame that we had before our deadline.

On Wednesday, we used the time that we had to re-film our bathroom scene - this had to be done because the initial footage we had of this was in 720p. rather than 1080p like the rest of our clips - an issue as it would look strange when editing and in the final edit if several of the scenes were of different quality. All of us contributed in several different ways, taking upon many different tasks individually; for one, I was both directing and filming. Jakub's tasks were to act and direct, and Seren and Ogo both switched between directing, filming and taking pictures to upload to the blog, too. 

This scene was probably one of the longest scenes for us to film, simply due to the amount of different angles and shots we decided to incorporate. Although we were staying back in our spare time, we didn't have a long time to complete this as the media equipment had to be returned by 4:30 latest, however we managed to finish this just in time. 

With this done, we decided that the next day (Thursday 26th) would be used to film our final scene, the college scene, and to put together all of the clips to form our second rough cut. 

No comments:

Post a Comment